View CfT Workspace

CfT: DfI Roads and Rivers T-1127 Coleraine Ring Road Cycle Path Phase 1

Buyer Organisation:
DfI Transport and Road Asset Management (TRAM)
Title:
DfI Roads and Rivers T-1127 Coleraine Ring Road Cycle Path Phase 1
CfT CA Unique ID:
DfI Roads and Rivers -196
Evaluation Mechanism:
Price/Cost Effectiveness
Description:
The site covers the following sections of the A29 Coleraine Ring Road carriageway • between the Beechfield Park priority junction and the exit taper on the southern arm of the Bushmills Road Roundabout (approx. 0.9km) • between the exit taper on the northern arm of the Bushmills Road Roundabout and the entry flare on the southern arm of the Portrush Road Roundabout (approx. 1.41km). The works will be carried out within the extents of the existing paved width. The project involves All permanent and temporary works associated with the realignment and resurfacing of the A29 Coleraine Ring Road carriageway to facilitate the provision of a shared active travel path along the western extent of the carriageway. The site extents consist of the A29 Coleraine Ring Road carriageway between the Beechfield Park priority junction and the exit taper on the southern arm of the Bushmills Road Roundabout (0.9km), and the section between the exit taper on the northern arm of the Bushmills Road Roundabout and the entry flare on the southern arm of the Portrush Road Roundabout (1.41km). Key works activities within the site will include: A. Site clearance B. Realignment and resurfacing of the existing carriageway as per the contract drawings, to alter the existing paved cross section from hard shoulder-carriageway-hard shoulder, to 3.5m shared footway/cycleway-1m landscape strip-1m hard strip-carriageway-1m hard strip C. Reducing the northbound and southbound traffic lane widths to facilitate the provision of a 1m wide landscape strip and 3.5m wide shared footway/ cycleway along the western side of the carriageway. D. Construction of the 3.5m wide shared footway/ cycleway to a depth of 230mm. E. Installation of new road, footway and verge drainage F. The raising of existing gully covers and existing manhole/service covers. G. Providing new road markings H. Installation of tactile paving I. Installation of a Vehicle Restraint System J. Landscaping consisting of topsoiling and grassing K. Temporary traffic management on roads as defined by the Roads (NI) Order 1993. L. Making arrangements with all relevant Statutory Undertakers and Public Authorities within the Works M. Fulfilling the duties of the Principal Contractor under the Construction (Design and Management) Regulations 2016.
Services, Works, Goods:
Works
Directive:
Old Classic
Procedure:
Open
CfT Involves:
A Public Contract
CPV Codes:
45000000-Construction work
45200000-Works for complete or part construction and civil engineering work
45220000-Engineering works and construction works
45230000-Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Contact Point:
pb1@infrastructure-ni.gov.uk
Award per Item:
No
NUTS codes:
UKN0
Above or Below Threshold:
Below
Time-limit for receipt of tenders or requests to participate:
15/03/2022 15:00
End of clarification period:
15/03/2022 15:00
Upload of documents within the clarifications:
Yes
Tenders Opening Date:
15/03/2022 15:30
Allow suppliers to make an online Expression Of Interest:
Yes
Contract awarded in Lots:
No
EU funding:
No
Multiple tenders will be accepted:
No
Contract duration in months or years, excluding extensions:
7 months
Validity of Tender in days or months:
90 days
Date of Publication/Invitation:
02/02/2022 17:32
Publication Date of Contract Award Notice:
13/06/2022 14:17